"a.tahir dengiz" etiketli yazılar:

TURKSAT-3USAT Is Almost Ready!

 A.Tahir DENGİZ, TA2T
 13 Şubat 2013
TAMSAT V/U Transponder

Dear Ham Radio Operators and AMSAT-TR Friends,

The final touches are nearly being completed for “TURKSAT–3USAT” LEO Communication Satellite, to be placed in its 680 Km orbit in May,2013. As defined by the program; V/U TRANSPONDER’s designed and produced by AMSAT-TR; have been pre tested before the integration phase, in Istanbul Technical University (ITU) – Space Systems Design and Test Laboratuary (USTTL) and we are invited to participate this test. A.Tahir DENGIZ, TA2T, President and  Baris DINC, TA7W Vice President were at the Laboratuary in February, 09 th,2013.

TAMSAT V/U Transponder’in Son Aşamaları Tamamlanmak Üzere

 A.Tahir DENGİZ, TA2T
 13 Şubat 2013
TAMSAT V/U Transponder

Sevgili Amatör arkadaşlar, değerli TAMSAT dostları,

Nisan 2013 ayı ortalarında uzaya gönderilmesi planlanan ve 680 Km. yükseklikte alçak Dünya yörüngesine (İng. Low Earth Orbit –  LEO) yerleştirilecek olan yeni TÜRKSAT-3USAT haberleşme uydusunun son hazırlıkları tamamlanıyor. TAMSAT Derneğimiz tarafından projelendirilip üretimi gerçekleştirilen modüllerden iki adet V/U TRANSPONDER (VHF 145.940-145.990 MHz frekans aralığında gönderilen sinyalleri UHF 435.200-435.250 MHz aralığına taşıyan alıcı/verici sistem)  ile ilgili olarak yapılan testleri yakından izlemek ve bir bölümünü de tekrar gerçekleştirerek bilgi haznemizi zenginleştirmek için, bizler; A. Tahir DENGİZ (TA2T) ve Barış DİNÇ (TA7W); 09.Şubat.2013 Cumartesi günü saat 10:30 da İstanbul Teknik Üniversitesi (İTÜ) – Uzay Sistemleri Tasarım ve Test Laboratuvarı (USTTL)’na gittik.

Sayfa 1 ile 11